Files
optimclaw/docs
[email protected]andClaude Opus 4.6 bc2d5b6b83 docs(engine): update architecture plan with Phase 6 status and approval flow design
Phase 6 updated to reflect what was actually built:
- Bridge adapters (LLM, Effect, InMemoryStore, Router) — all done
- Integration touchpoint (4 lines in handle_message) — done
- Live progress via broadcast events — done
- Conversation persistence across messages — done
- Trace recording + retrospective analysis — done
- 8 bugs found and fixed via trace analysis — documented

Phase 6 remaining work documented:
- Approval flow: detailed 5-step design (send to channel, pause thread,
  route response, resume execution, always handling) with v1 reference
- Database persistence (InMemoryStore → real DB tables)
- Acceptance testing (TestRig + TraceLlm fixtures)
- Two-phase commit for high-stakes effects

Progress table updated: Phase 6 marked as DONE (partial), 134 tests.

Co-Authored-By: Claude Opus 4.6 (1M context) <[email protected]>
2026-03-23 15:14:27 -07:00
..